The stage pipeline

Idea -> Research -> Scope -> PRD -> ADR -> Contract -> Cards -> Build -> Review -> Deploy -> Verify-live -> Retro
|------------------ planning (files in flow/) ------------------| |------- shipping (inside cards/) -------|

The pipeline is not a checklist of documents to produce. Each stage exists because a specific kind of self-deception tends to happen at that point in a build, and the gate is aimed at that deception.

Planning artifacts live under flow/ and are numbered so the order is not negotiable.

00 — Idea. A three-sentence pitch: who has the problem, what they do today, what you would do instead. The gate is looking for a problem rather than a solution wearing a problem’s clothes. This is the cheapest place in the entire project to kill something.

01 — Research. What already exists: competitors, live systems, real prices. The rule is inspect first, evidence not vibes. This stage is where fabrication is most tempting and most expensive, because a plan built on invented competitors is confidently wrong for weeks. A script cannot detect an invented quote; the semantic gate is the only defence.

02 — Scope. Grade features and cut. The characteristic failure here is grade-laundering — a C-grade feature written up as a B because you want to build it. Scope is where most projects are saved or lost, which is why work mode pauses for an explicit operator sign-off at exactly this point and nowhere else.

03 — PRD. The surviving scope becomes numbered functional requirements. Every FRn written here must later be claimed by a card and served by a contract interface. That trace is mechanically auditable, so a requirement cannot quietly evaporate between planning and building.

04 — ADR. Architecture decisions, including what you rejected and why. The rejected options are the valuable part: six months later they are the reason nobody re-litigates a settled question.

05 — Contract. The interfaces, written before any code exists. Method, path, auth, request and response shapes for a web project; commands, flags, output shapes and exit codes for a CLI; the exported API surface for a library; the command surface for a skill.

Every other planning stage can be skipped with honest recorded debt. Stage 05 cannot, ever.

The contract is the seam. Producers build to it, consumers build from it, and the two sides can proceed independently precisely because the shape between them is fixed. Skipping it does not save time; it relocates the cost to integration, where two half-built sides discover they disagree and someone rewrites one of them.

The discipline that follows is strict: never improvise a shape. If a shape turns out wrong, amend the contract first and then change the code. Honour a shape now with a null or a stub even when its real value ships in a later card.

If the contract does not fit your project type, adapt it — read “endpoint” as “interface” or “command” — rather than skipping it.

After stage 05 passes, /flow card cuts build cards. Each card is one scoped build session with an allowed-files list, the requirements it implements, a verify block, an independent test, and an evidence section that starts empty.

Build, review adversarially, deploy, then verify live as a user would. The card is done when world-state evidence is pasted in and the check gate passes — not when the tests are green.

An existing codebase does not start at Idea. /flow assess scaffolds and gates flow/00-inspect.md, a current-state map covering the stack, what the product does today against what it is supposed to do, risks, and the test baseline. It is operator-reviewed, and it exists so that planning for an existing system is grounded in what is actually there rather than in what the repository’s README claims.

One honest line per run, written by the operator and never by the agent. It feeds the durable layer, so the next project’s recall surfaces this project’s pain.

Every gate has three outcomes, not two: pass, block, and kill. A harness that can only say “proceed” is a conveyor belt with a compliance ritual attached. Killing a weak idea at Scope is the cheapest good decision available in a build.

/flow next gate-checks the stage you are on and, only if it passes, unlocks the next one. The runner treats the highest-numbered file already in flow/ as current. Planning is complete only when all six stage gates are clean; only then does /flow card unlock.

When the mechanical layer fails it prints exactly what is wrong with line numbers — unchecked gate boxes, leftover [FILL] placeholders — and stops. A FAIL never advances. The listing is the whole diagnosis: open the named file, fix those lines, run /flow next again. Do not guess which box was empty.

When the script passes, the semantic challenge for the stage just completed is applied before you are allowed to move on, so a mechanically clean but hollow artifact still gets named as weak. In teach mode the agent will never check a box or write an artifact for you; it only tells you what is failing.

Kill is a valid terminal state. Stopping at any gate, especially Scope, is an honored outcome, not a failure of the flow. Pass, block, and kill are the three answers; a harness that can only say “proceed” is a conveyor belt.

flow was born web-shaped. The honest way to support other kinds of software was not to generalise the gates into vagueness but to name exactly which three things change. Set the type with /flow project-type web|cli|library|skill before stage 05. The value is stored in a PROJECT_TYPE file and defaults to web. Running the command with no argument prints the current value and the done-evidence rule it implies.

The type adapts the stage 05 contract seam, the standard card sequence, and what done-evidence means. Everything else — every gate’s spirit, “contract before code”, “done is proof in the world” — is untouched. Changing the type later means revisiting the contract, so it is cheap now and expensive after.

  • web. Contract: HTTP endpoints (method, path, auth, request, response); OpenAPI served. Done: a live deployed URL plus real curl output.
  • cli. Contract: commands, flags, output shapes, exit codes. Done: the tool installs and a real invocation returns the expected output and exit code. First move on a CLI build: /flow project-type cli.
  • library. Contract: the public API surface — exported functions and types with their shapes. Done: the public API imports, a usage example runs, coverage threshold met.
  • skill. Contract: the commands and files the agent reads. Done: installed into the skill home and a real run reaches its own done-definition. First move on a skill build: /flow project-type skill.

A CLI build is not a diluted web build: the proof it must produce is just as concrete, it simply takes the shape of an installed tool and a real exit code rather than a deployed URL. The gates themselves are unchanged — only the shape of the proof moves.

Some stage-05 gate wording still says “endpoint” and asks for an auth column, which is web flavouring. For other types you read “endpoint” as “interface” or “command” and substitute writes and side-effects for auth — the stage preamble explicitly licenses that adaptation, and the equivalent no-drift check is the per-type done-evidence actually passing.

Set with /flow project-type <web|cli|library|skill>, stored in PROJECT_TYPE, default web.

Type Contract seam (stage 05) Done-evidence Card sequence
web HTTP endpoints — method, path, auth, request, response; OpenAPI served A live deployed URL plus real curl output scaffold and /healthz, vertical slice, backend, contract test, UI mock, frontend, e2e
cli Commands, flags, output shapes, exit codes The tool installs and a real invocation returns the expected output and exit code scaffold plus one real command, subcommand groups, tests, install smoke on a clean directory
library The public API surface — exported functions and types with their shapes The public API imports, a usage example runs, coverage threshold met scaffold plus core API, rounds of API, tests, a runnable usage example, publish dry-run
skill The commands and files the agent reads Installed into the skill home and a real run reaches its own done-definition scaffold plus one runnable command, references and law, install, a dogfood run

Constant across all four types: every requirement maps to an interface, every interface has its shapes written before code, the contract is the seam, and “tests pass” or “merged” is never done.

flow has four mode axes and they are genuinely independent, so you set each one per project and combine them however the work demands.

Authoring mode decides who writes the gate artifacts: teach, the default, means you write and the agent only gate-keeps; work means the agent interviews you once, drafts stages 00 to 05, and pauses only for the scope sign-off.

Project type decides what done means — a live URL for web, a real invocation and exit code for a CLI, an importable API for a library, an installed run for a skill.

Run mode decides how cards get built: manual, where you drive card, build, check; or auto, an autonomous run with tiered handling that halts on security-class work.

Greenfield versus brownfield decides where you start: stage 00-idea for something new, or a gated current-state assessment for an existing codebase.

What no axis changes is the bar. Gates and done-rules are identical across every combination; the modes move authorship, proof shape, and drive, never the height of the gate.

Unresolved product decisions live as - [ ] bullets under an ## Open decisions heading on the Scope, PRD, and Contract artifacts. They are counted by the same box scanner the gates already use, which means an unsettled decision genuinely blocks the stage rather than sitting in a comment nobody reads.

/flow clarify prints those leftover bullets, scoped to that section, and always exits 0 — it is an advisory printer, not a second gate. Settling them is a bounded, opt-in write-back ritual: work through the bullets one at a time, record the decision in the artifact, and check the box. Nothing about clarify is a prerequisite for /flow next; the gate scanner enforcing the boxes already is.

The runner copies templates into your project as each stage unlocks. Planning artifacts live under flow/, shipping units under cards/, and ledgers at the project root. Paths below are files, not headings.

Path Stage Contents
flow/00-idea.md 00 The three-sentence pitch: who has the problem, what they do today, what you would do instead
flow/00-inspect.md brownfield Current-state assessment: stack, functionality against product goals, risks, test baseline
flow/01-research.md 01 What already exists — competitors, live systems, real evidence
flow/02-scope.md 02 Graded features, cuts, and the scope sign-off
flow/03-prd.md 03 Numbered functional requirements (FRn)
flow/04-adr.md 04 Architecture decisions, including rejected options
flow/05-contract.md 05 The interfaces, written before code. The seam. Never skippable
flow/constitution.md optional Operator-authored per-project invariants, advisory
cards/C-NNN.md build One scoped build session: allowed files, implements, verify, independent test, evidence, risk
MODE, PROJECT_TYPE — Authoring mode and project type
DEBT.md, RETRO.md, AUTO-LOG.md — Deliberate skips, retro lines, autonomous run log
.flow/harness.db — Durable records

Every planning artifact ships with [FILL] placeholders and gate boxes; both are scanned mechanically, and either one left unresolved fails the stage. Unresolved decisions belong under an ## Open decisions heading, where the same scanner counts them.


Maintainer homes (not the public page): skills/flow/references/stage-state-machine.md, skills/flow/references/project-types.md, skills/flow/references/mode-work.md, skills/flow/references/clarify.md.